2016-17 interfund transfers
Part of the 2016-17 budget included $3,052,736 million in interfund transfers to the capital fund to enable the district to perform minor reconstruction of its existing facilities as described below. A positive budget vote constituted voter approval of these capital projects.
Blue Creek Elementary:
- Mill and resurface main driveway, bus loop and all parking areas
- Construct new student drop-off area & replace building sign
- Create additional parking lot on west end of building with raised walkway along front of building from new area to main sidewalk
- Install stand-by generator for building and central kitchen refrigeration
Boght Hills Elementary:
- Replace the roof and all composite exterior panels on the 1991 addition
- Replace the building sign at the end of the school driveway
Forts Ferry Elementary:
- Replace original corridor convector heaters, kitchen ventilation and toilet/wing exhaust fans and tie them into the energy management system
Latham Ridge Elementary:
- Replace original domestic water shut off valves building wide
Southgate Elementary:
- Replace the roof on the 1991 addition
Shaker Junior High School:
- Replace two sets of fire rated wood gym doors with fire rated Fiberglass Reinforced Polyester (FRP) metal framed doors
- Improve the PA system for the gymnasium for emergency communications between the main office and gymnasiums
Shaker High School:
- Remove wood bleachers on “home” side of field and relocate and increase “home” seating by approximately 400
- Mill and pave student walk path from entry at Blue Creek to K-Wing entrance to Shaker High and tie paving into J Wing and K-Wing Exits
- Grade and install necessary drainage from K-Wing to around H-Gym to mitigate flooding behind the building
- Replace three Roof Top AC units for the hall offices and teacher prep area
- Repoint E-boiler room chimney and make additional masonry repairs at H-gym walls and receiving area
- Replace the univents, covers, radiation, and pumps in various wings; add air conditioning to uninvent in several areas
- Pool renovation work
- Repair courtyard deck roof area
- Reconfigure Media Center to create Learning Commons Space and adjunct learning areas
- Replace F Gym lighting with energy efficient light fixtures
- Construct and install custom Art Room sink/storage units
Transportation Department:
- Construct parapet at the front and rear of the heated portion of the building and additional roof work where required; replace bus exhaust for mechanic bays
Goodrich School:
- Phase I: Abatement and reconstruction of previous daycare spaces into district office/storage space
Districtwide:
- Replacement of the district telephone system